Denver, CO

Demolition at 360 S Ogden ST

In Progress

2026-DEMO-0000316 · Denver · filed 2026-07-09

Full and Partial Demolition: Structure: 2-Car Detached Garage Accessory Structure Dimensions / Area: 20' x 21' (420 Sq. Ft.), 1-story (12') in height. Construction Type: Wood-framed walls, pitched roof with composite shingles, built over a concrete slab-on-grade foundation. Extent of Demolition: Full demolition. The structure is to be completely razed, including the systematic dismantling of the roof, walls, framing, and full extraction/removal of the concrete slab and perimeter footings down to clean grade.

Status timeline

  1. 2026-07-09Accepted
  2. 2026-07-09Review Not Required
  3. 2026-07-09In progress
  4. 2026-07-09Initial Review
  5. 2026-07-14Not Approved

Pro members see the issuance forecast for this permit: median-based date range, cohort receipts, and change alerts.

Issuance window: ▓▓▓▓▓▓▓ to ▓▓▓▓▓▓▓

Cohort receipts: n=▓▓ · median ▓▓ days

Change alerts: ▓▓▓▓▓▓

Create free account

Parcel

0514207007000