Demolition at 3060 N Brighton BLVD
2026-DEMO-0000328 · Denver · filed 2026-07-15
Interior prep demolition work to be done on the first floor and the basement level of the building. In the basement, demolition occurs in Mothers Room 023 and includes removing casework, plumbing fixtures, and lighting fixtures, removing the door, and partial demolition of the wall for a new opening. On level 1, demolition work includes demolishing the millwork, plumbing fixtures, and lighting fixtures at the coffee bar near the lobby. It also includes the demolition of non-structural walls, removing gyp bd from walls, removing operable partitions, ceilings, carpet, mechanical ductwork, lighting fixtures, electrical and data conduit in walls to be removed, and doors not required for egress within the area of the existing rooms Showrooms 120, 122, 124, 126, 128, Photo Studio 130, Changing Room 130B, Workspace 130A, Workspace 124A, TNF War Room 118 and Closet 118 and 118A. Existing fire suppression system, fire-rated assemblies and egress elements to be maintained.
Status timeline
- 2026-07-15Approved
- 2026-07-15TBD
- 2026-07-15Issued
- 2026-07-15In progress
- 2026-07-15Pending
Pro members see the issuance forecast for this permit: median-based date range, cohort receipts, and change alerts.
Issuance window: ▓▓▓▓▓▓▓ to ▓▓▓▓▓▓▓
Cohort receipts: n=▓▓ · median ▓▓ days
Change alerts: ▓▓▓▓▓▓
Parcel
0227500123000